In the 40th joined meeting of the CIDOC CRM SIG and ISO/TC46/SC4/WG9 and the 33nd FRBR - CIDOC CRM Harmonization meeting, the crm-sig resolving the issue 332 and discussed about the Thanasis Velios comment that we need a property to link S6 with the data with which we make the calculation, decided to open new issue to formulate the belief conditions for the input data of the data evaluation process. Need to add a link of input data AND this has to be connected to CRMdig.
Cologne, January 2018
In the 41st joined meeting of the CIDOC CRM SIG and ISO/TC46/SC4/WG9 and the 34th FRBR - CIDOC CRM Harmonization meeting, the sig decided to assign HW to Thanasis, MD and OE the resolution of this issue.
Lyon, May 2018
Posted by Thanasis on 18/11/2018
Dear all,
Please find attached an attempt to model S6 Data Evaluation in relation to the D9 Data Object. The question is whether a direct property between the two is needed, or whether we can model it through CRMinf and what the conditions would be. I would like to double-check with you my understanding of CRminf as there are no cardinalities in the current draft.
In the example of calculating the height of a statue from the size of a fragment of the foot, we need to consider that:
1) The height of statues are proportional to the sizes of the corresponding feet (linear interpolation),
2) The material of the statue is stable in dimension over the centuries
Understanding 1:
If these two are considered as two different I5 Inference Makings (because they use two different I3 Inference Logics), then connecting D9 to S6 is possible through CRMinf, although it is a long path.
Understanding 2:
If these two are considered as one I5 Inference Making, then I think there is no way to tell which proposition S6 refers to and a new property is needed. In this case the D9 Data Object has to be part of
the proposition set.
In both cases the I6 Belief Value should be True on the proposition set for the evaluation to make sense.
Comments?
In the 44th joint meeting of the CIDOC CRM SIG and ISO/TC46/SC4/WG9; 37th FRBR - CIDOC CRM Harmonization meeting, the sig reviewed the alternative solutions proposed by TV regarding the correct way to model the relation of S6 Data Evaluation to D9 Data Object.
DECISION: Appealing to one instance of S5/I5 Inference Making and directly linking it to D9 data Object through a new property was not considered felicitous.
DECISION: The right way to model the relation of S6 Data Evaluation to D9 Data Object, is go through two separate instances of S5/I5 Inference Making that each used as premise (J1) a distinct instance of I2 Belief that (J4) a Proposition Set (I4) –which involves an instance of D9 –holds true.
The issue is closed.
Paris, June 2019